Well only had time to do the odd jobs on Gladys today. Running sweet,also she started first time since i haven't started her for 2 weeks. Anti freeze renewed and replaced alternator. Must now find the time to get her Mot ready for 2007.
Have been unable to work on the hurricane this week.
And Gladys the new addition is all up and running the only thing that needs attention is to drain the rad and refill with anti freeze and replace the alternator.
Which will be done as soon as the v5 arrives back so i can then MOT and tax her.
Well the chassis has been shot blasted.We have 1 coat of red oxide and 2 coats of satin black. All items that will be reused will be stripped to bare metal.